Waste Water Treatment Plant – Reference Materials

2022 SCS I&I Inspection Report REV Urban Systems
2022 SCS Predesign Report final Certified Urban Systems

2023 Urban Systems SCS Mem Additional Connections draft
2021 Urban Systems SCS Equalization Tank Size Update draft
2021 Urban Systems SCS Tech Memo 1 Flows and Loads Update final sealed

KWL_SCS Capacity Analysis 2017 Draft Memo
BIM_Semi-Annual Reports BC MoE OCT 2017-APR 2020
Urban Systems SCWWT Capacity Review_2019
CAN-DIVE_SCS Outfall Inspection Report_2005
KWL_SCS distilleryWWDischargeReview_FinalTMemo 2017
BC Ministry of Env_Discharge Permit PE-7859_2001
Mangat_SCS_Assessment Report 2013
Dayton & Knight Outfall Key Plan Drawings 1998
Seaveyors_SCS_Environmental & Marine Services Report_2013
Urban Systems SC WWS Capacity Assessment Expansion Scoping REV 1 2020 

Permits to operate all systems

Permit to operate expires March 2025

Request for Proposals (RFP): Design and Contruction Services for Bowen Island Municipal Water System Improvements

Bowen Island Municipality posted an RFP for water system improvements on BC Bids and the municipal website from August 25, 2020 to October 1, 2020. The contract was ultimately awarded to Urban Systems, Ltd. Please find the RFP and addenda linked below.

Other Reference Materials

Drawings: